Industrial multi use remote control grab bucket for ship lifting
Four-rope Clamshell Grab, type FSG
Handling bulk material 's density up to 1.0t/m³
Crane lifting capacity | T | 25 | 32 | 40 | 50 |
Density | t/m3 | 1.0 | |||
Grab Volume (40°dome) | m³ | 16.5 | 19.8 | 25.0 | 32.0 |
Dead weight -3 fold | t | 8.5 | 12.2 | 15.0 | 18.0 |
Dimensions | A(mm) | 4820 | 5110 | 5620 | 5920 |
B(mm) | 5450 | 5770 | 6380 | 6650 | |
C(mm) | 3590 | 3870 | 4180 | 4450 | |
D(mm) | 5140 | 5150 | 5690 | 6230 | |
E(mm) | 3400 | 3500 | 3900 | 4200 | |
a(mm) | 670 | 755 | 850 | 950 | |
b(mm) | 1300 | 1400 | 1400 | 1550 | |
Closing rope stroke 3-fold | mm | 8130 | 8240 | 9180 | 9720 |
Standard diameter of closing ropes | mm | 32 | 36 | 40 | 42 |
Closing rope-total length to operate 3-fold | mm | 15000 | 15700 | 17200 | 18700 |
Dianmeter of closing rope sheaves | mm | 630 | 710 | 800 | 900 |
If you want to customize as your special need, kindly support to provide below information:
1 | Where will you use the grab | Ports, power plants, steel mills, stations, water conservancy, shipping, mining areas, construction sites, forest farms, cement plants, waste disposal sites, breweries |
2 | What's the SWL of your crane | SWL of Ship unloader, gantry crane,deck crane, travelling crane |
3 | what's the cargo will grab | Such as alumina, aluminumoxide,Ashes-wet or Ashes-dry, barley, beans,soy, brewers grain,cement portland, clay wet excavated,nickel ore, grain/wheat, crushed iron ore,dry lignite, lime/stone/lump, common stone,solid sulphur, lump sulphur,pulverized sulphur, broken anthracite coal, broken bituminous coal |
These informations above can make us know more about your requirements.It will help us offer you the best suitable solution with best price and quality. |
All grab that we provide, we can promise:
Technic support | 1, customized design team communicate with customer |
2, customer's special need will take into account during design and produce | |
3, communicate well and find the best suitable solution | |
Quality control (3tests before delivery) | 1,Test the parts of the test-bed to test the reliability of components before installation |
2, hour no-load test of the grab, check the pressure and temperature holding performance of the hydraulic system and various performance data of the grab | |
3,The grab shall be tested continuously for 8 hours with load to detect the temperature control of the grab and the stability under continuous load (three consecutive days if necessary) |
Contact Person : | Winnie |
---|